When ANGELO PO GRANDI CUCINE S.p.A. decided to expand its headquarters in
Given the semi-transparent nature of the panels, the installation serves the dual purpose of generating electrical energy and providing shade for the stairwell. According to the guidelines issued by the Italian electricity agency, the installation is classed as fully integrated and therefore enjoys the full subsidy for the power produced.
80 Würth Solar 20% semi-transparent CIS panels
58 square metres of photovoltaic surface area
Installed power: 4.4 kWp
[Google Maps search: Strada s.s. Romana Sud 90/F - 41012 -


