One of the main objectives of this project was to ensure the ecological sustainability of the building, including its architectural features, load bearing structures and automation systems. The project combined functional efficiency with a high level of environmental compatibility by using alternative, non-traditional energy solutions to minimise environmental impact.
The energy derived from the photovoltaic installation is used to power the building’s common electrical services (e.g. lifts, lighting, and common area heating).
- 1071 Würth Solar CIS panels on the façades of the two towers, giving an installed power of 80 kWp
- 174 monocrystalline silicon panels on the roof, giving an installed power of 40 kWp
- 1035 square metres of total surface area
- 99,400 kWh per annum, with 42,000 kWh produced during the winter months